ProfessorDev Ranmuthugala

Adjunct Professor

National Centre for Maritime Engineering and Hydrodynamics

  • Adjunct Professor
    National Centre for Maritime Engineering and Hydrodynamics

FUNDED PROJECTS

  • CONSULTANCY/CONTRACT RESEARCH
    Defence Material Technology Centre- Blast and Shock modelling
    1 Jan 2016 - 31 Dec 2020
    People funded by this grant:
    • Binns J,
    • Ranmuthugala D,
    • Ojeda Rabanal R,
    • Abbassi R,
    • Garaniya V
    Project Total: $276,221; Blast and shock modelling project for the Defence Material Technology Centre Funded by: Defence Materials Technology Centre ($276,221); University of Tasmania.
  • GRANT
    The development of a world-class facility for three dimensional dynamic testing
    30 Jun 2015 - 31 Dec 2015
    People funded by this grant:
    • Cazzolato B,
    • Sammut K,
    • Thewlis D,
    • Wilson J,
    • Ranmuthugala D
    Project Total: $400,000; This project will see establishment of a world-class facility for multi-directional dynamic testing. Currently there are no such facilities in Australia. This includes such areas as vibration testing, materials testing, biomechanics and human factors, blast and earthquake simulations, field robotics, automotive safety research, flight/vehicle simulation, and marine applications. Funded by: Australian Research Council - Grant-Linkage Infrastructure; University of Tasmania ($20,000).
  • GRANT
    The ARC Research Training Centre for Naval Design and Manufacturing
    12 Jan 2015 - 31 Mar 2020
    People funded by this grant:
    • Binns J,
    • Norrish J,
    • Ranmuthugala D,
    • Sammut K,
    • Ojeda Rabanal R
    Project Total: $2,659,935; The Training Centre will transform the Australian naval manufacturing industry by creating a new cohort of industry-focused, high-level and broadly skilled engineers and researchers. The resulting network of engineering researchers will enable the industry to more rapidly innovate and solve key problems concerning the efficient design, construction and sustainment of naval platforms. This industrial transformation will bring significant benefits to Australia as it commences a very ambitious shipbuilding program comprising the design and manufacture of new fleets of submarines, future frigates and patrol boats. The success of these major projects is reliant on developing this cohort of researchers to solve the key research questions. Funded by: Australian Research Council - Grant-Industrial Transformation Training Centres ($2,389,935); ASC Pty Ltd ($120,000); Austal Ships Pty (Ride Control Section) ($30,000); PMB Defence Engineering Pty Ltd ($30,000); Babcock International Group ($30,000); Thales Australian Ltd ($30,000); Serco Australia Pty Ltd ($30,000); University of Tasmania.
  • CONSULTANCY/CONTRACT RESEARCH
    Feasibility study into locating a ship lift facility at Bell Bay, Tasmania
    11 Nov 2014 - 31 Dec 2015
    People funded by this grant:
    • Cahoon S,
    • Bowles M,
    • Ranmuthugala D
    Project Total: $40,566; The objective of the project is to investigate the economic feasibility of locating a ship lift facility at Bell Bay in Northern Tasmania. The project originated from the AMC's Strategic Industry Group that confirmed the pressing industry demand and economic advantage of establishing a shift lift facility at Bell Bay. In conjunction with TasPorts (as the Placement Recipient and Funding Recipient with the Researcher in Business program), UTAS (as the Placement Provider) researchers and research assistants from AMC-NCPS will undertake the feasibility study to determine direct and indirect costs to construct the ship lift facility, this will include identifying: 1. Demand and capacity planning 2. Specifications for the ship lift system and facilities 3. Initial environmental and regional infrastructure considerations 4. Regional economic impact 5. Facility relocation or construction considerations 6. Facility investment and ownership options 7. Risk analysis 8. Revenue model and forecast 9. Infrastructure and other associated costs The outcome of the project is to provide Tasports with sufficient analysis and options to further consider their interest in developing the ship lift facility Funded by: Department of Industry, Science, Energy and Resources ($20,283); Tasmanian Ports Corporation Pty Ltd ($20,283); University of Tasmania.
  • GRANT
    Engineering pathways for regional Australia:viable learning platforms built by knowledge partnering
    1 Feb 2014 - 31 Aug 2017
    People funded by this grant:
    • Allison J,
    • Chai S,
    • Kilpatrick S,
    • Jarvis L,
    • Ranmuthugala D
    Project Total: $324,000; This project will collaborate with partners to develop a new learning platform for engineering students. Funded by: Office for Learning & Teaching - Grant-Innovation and Development Grants Program ($324,000); University of Tasmania.
  • GRANT
    Calculus in the real world: transforming the way we teach Mathematics in primary education
    14 Jan 2014 - 30 Jun 2018
    People funded by this grant:
    • Fluck A,
    • Ranmuthugala D,
    • Chin C,
    • Penesis I
    Project Total: $150,000; This project will demonstrate a transformation in the way mathematics is taught to primary school students, enabling them to solve real-world problems using calculus. Building on an award-winning pilot project in which primary students used professional engineering software to master university-level calculus, the project will provide hundreds of young people access to this and more advanced topics. Teachers will be trained to use multi-media learning materials designed at the University of Tasmania in conjunction with an inter-disciplinary team involving the Australian Maritime College. The project will promote a love of learning mathematics to encourage enrolment in tertiary subjects such as Science and Engineering, which have been in decline. Funded by: Australian Research Council - Grant-Linkage Projects Round 1 ($150,000); University of Tasmania ($73,959).
  • GRANT
    Evaluating and selecting STEM resources: capacity building for teachers in rural and regional schools
    1 Jan 2014 - 19 Dec 2014
    People funded by this grant:
    • Kilpatrick S,
    • Fraser S,
    • Beswick K,
    • Chin C,
    • Fitzallen N
    Project Total: $378,000; The project aims to establish a sustainable model for building confidence and capacity of rural and regional primary and junior secondary teachers of science, technology and mathematics (STEM) through a teacher and expert jointly-developed framework for teacher analysis, critique, and evaluation of STEM resources. Funded by: Department of Industry, Science, Energy and Resources - Grant-Aust Maths and Science Partnership Program ($378,000); University of Tasmania.
  • CONSULTANCY/CONTRACT RESEARCH
    Hydrodynamic forces of Ro-Ro thrusters affecting Articulating Concrete Blocks
    1 Jan 2014 - 31 Dec 2018
    People funded by this grant:
    • Weber J,
    • Binns J,
    • Ranmuthugala D,
    • Chin C
    Project Total: $5,000; The aim of this project is integrating numerical, empirical and experimental results of the hydrodynamic forces generated by Ro-Ro thrusters affecting the stabilization of Articulating Concrete Blocks (ACB) revetments in terms of lift and drag. This project was divided into two stages: the physical experiments and the numerical experiments. The design of the Ro-Ro thrusters acting on the Ro-Ro ramp in a 1:10 scale wiII be created. A propeller, to stimulate the thruster of an ordinary Ro-Ro ship with diameter of 1.80m in full scale will be developed. The scaled model of ACBs revetment mattress type 3 will be placed on top of the designed beach ramp structure with two different slopes. The propeller wash running in shallow water will generate current and waves that will attack the beach revetment at different speeds. The velocity of the fluid will be verified using a Pilot tube at different points after the propeller hydrodynamic forces and moments acting on the revetment mattress will be measured using 6 degree of freedom load cells. An analysis of these forces and moments acting on the revetment mattress will be conducted however, the environmental loads (current and waves) and the hull effects will not be included in the model as this study is based on a stationary Ro-Ro ship and the forces generated by the hull and environment will be neglected. The empirical method of Pilarczyk and PIANC will be also used to calculate the stability of the flow and the revetment mattress. A comparison of physical experiments, Computational Fluid Dynamics (CFD) results and empirical method will be performed. The outcomes of this project are: verification of the performance and stability levels (scour forces: lift and drag forces and movements) of a scaled A CBs revetment. Funded by: Subcon Technologies Pty Ltd ($5,000); University of Tasmania.
  • GRANT
    Science-ercise: modern physics in primary classrooms of North-West Tasmania
    16 Dec 2013 - 30 Jun 2016
    People funded by this grant:
    • Fluck A,
    • Ranmuthugala D,
    • Chin C
    Project Total: $36,362; This project will show that modern physics can be understood by primary school students, who can then use these new skills to solve real-world problems usually only attempted by senior secondary students. Funded by: Ian Potter Foundation - Grant ($36,362); University of Tasmania ($7,000).
  • CONSULTANCY/CONTRACT RESEARCH
    Potential failure mechanisms of bulk iron ore cargoes; relevance of current Transportable Moisture Limit (TML) test methods to any failure
    1 Jan 2013 - 31 Dec 2013
    People funded by this grant:
    • Ranmuthugala D,
    • Symes M
    Project Total: $25,000; The aim of the project is to produce data in relation to potential failure mechanisms of bulk iron ore cargoes. To date little is understood on the response of iron ore in a sea state, there is interest in the effect of moisture content on the risk of dangerous behaviour of an iron ore load in a bulk carrier under various sea states and routes. This research sets out to produce RAO response data on selected vessels in a worst and best case voyage. The project will assess the relevance of current Transportable Moisture Limit (TML) test methods to any failure at the request of AMIRA as specified below: 1. Produce data on the classes of ships carrying iron ore fines on major shipping routes around the world - to include shipments in smaller vessels from India, Africa etc. as well as the major exporters like Australia and Brazil. Specify the most common ship classes carrying iron ore fines. 2. Produce scatter diagrams of likely sea states to be considered given the global routes for each of the classes of vessels described above, and a distribution of forward speeds. 3. Cut down the number of cases for analysis based on mariners' experience. Define a 'typical voyage' and 'worst case voyage' for three dry bulk carrier classes: Large Cape Size; Medium Cape Size; Handy Size. 4. Produce motion RAOs at CG and offsets of several points of interest for the chosen vessels. RAOs to be computed for four encounter angles: head, bow, beam, and quartering, and nominal forward speed or speeds. It addresses the research question: What are the RAO responses of bulk carriers in a typical and worst case voyage? Funded by: AMIRA International Ltd ($25,000); University of Tasmania.
  • GRANT
    Transforming Curriculum: A New Approach to Calculus Using Laptops in Primary Schools
    1 Jan 2010 - 31 Dec 2010
    People funded by this grant:
    • Fluck A,
    • Ranmuthugala D
    Project Total: $23,831; Funded by: University of Tasmania - Grant-Institutional Research Scheme; University of Tasmania ($23,831).
  • CONSULTANCY/CONTRACT RESEARCH
    Ship Model Research
    8 Sep 2009 - 31 Dec 2013
    People funded by this grant:
    • Boyle T,
    • Ranmuthugala D,
    • Rolls A
    Project Total: $15,000; Funded by: Kongsberg Maritime AS Simulation ($15,000); University of Tasmania.